Foundations

August 14, 2018 in CIVIL CONSTRUCTION

Radiation-type foundation of the reactor chamber

  • Surface: 1.008,76 m2
  • Concrete volume: 968,9 m3
  • Armature: 93,00 t
  • Metallic parts embedded in concrete: 5,59 t
  • Number of persons in charge with execution: 30
  • Execution time: 2 weeks

Foundation for adhesive tanks

  • Surface: 2.688,00 m2
  • Concrete volume: 3.763,00 m3
  • Armature: 99,40 t
  • Metallic parts embedded in concrete: 4,50 t
  • Number of persons in charge with execution: 50
  • Execution time: 6 weeks