CIVIL CONSTRUCTION

April 17, 2024

BERCENI ROAD JUNCTION

Location: București Beltway - DJ401 (km 33+190 - km 35+603) Project description: construction of a roundabout suspended over the București South Beltway Technical specifications: - widening the beltway to 4 lanes - 30 pillars, 6 ledges, monolith infrastructure, superstructure: prefabricated beams, metal deck for the suspended roundabout - construction of side roads / easement road, [...]
April 17, 2024

EXTENSION AND INTERIOR RECOMPARTMENTATION OF THE TURDA RIDING ARENA

Location: 7, Aleea Durgăului, Mun. Turda, Cluj County. The project consists of the demolition, reconstruction and interior re-compartmentalization of a multi-purpose building. The new construction will include an indoor riding arena, horse stalls, restaurant, hotel, conference room, event hall and terrace. The building has a P+Mez.+2E+R height scheme, with a total of 58 rooms. Built [...]
April 17, 2024

POWER PLANT CEG 4+5, CAMPIA TURZII

Location: Câmpia Turzii, str. Laminoristilor, no. 157, Cluj county The project consists in increasing the production capacity of the Nova Power and Gas Electroenergetic Ensemble consisting of two CEG1 + 2 Power Plants executed in 2021 and those that will be built this year, respectively CEG 4+5. The installed power of the 4 groups is [...]
April 17, 2024

VIADUCT OVER CFR LINE AND HIGHWAY

Project description: Viaduct on DN14A over highway and CFR line - Structure 2 Transylvania Highway Technical Specs: • 380 m long and 12 m wide massive harbour infrastructure with circular posts and upper ruler • indirect foundations on large diameter piles • massive reinforced concrete radar • superstructure of 5 prefabricated precast beams • sidewalks [...]
July 12, 2021

NATURAL GAS POWER PLANT, CAMPIA TURZII

The project includes the realization of an electric power assembly consisting of two power plants equipped with generating sets with gas motors, with an individual capacity of 6.72 MW, and the extension of the 20kV distribution network. The duration of the works is five months. The plant is located in the Reif Industrial Park, near [...]