CFR CARANSEBES 110KV POWER STATION

CFR CARANSEBES 110KV POWER STATION The projected involved the refurbishment of an existing power station: a new modular control room, fences, VT , control cables, lightning and srveillance. The works took place around an operating 110kV LEA networks. The works included: A new modular control room A new concrete foundation for VT Civil works: concrete [...]
August 14, 2018

BLAJ 110/20/6KV POWER STATION

BLAJ 110/20/6KV POWER STATION The project involved the refurbishment and construction works within an existing power station. The works were carried out in the conditions of maintaining the functioning of the installations for ensuring the customers continuous power supply The works included: Refurbishment of the control building and roof Replacing the old concrete foundations with [...]
August 14, 2018

VULCAN 110/20/10KV POWER STATION

VULCAN 110/20/10KV POWER STATION Civil works included: Replacement of the 110 kV transformer cell lines through the decommissioning of the existing GIS cells; installation and commissioning of a new hybrid equipment Replacement of the neutral treatment groups and the installation of a fault current detection on all MV feeders; Replacement of the 110 kV power [...]
August 14, 2018

JUCU 110/20KV POWER STATION

JUCU 110/20KV POWER STATION The renovation and construction works within the existing operating 110kV power station included: replacement of the existing cells, of the relay room, MV switchgear room, LV services and electrical equipment Civil works included: Refurbishment of the control and connection building; Replacing of the existing foundations; Replacing the concrete old structure with [...]