CIVIL CONSTRUCTION

August 14, 2018

Foundations

Radiation-type foundation of the reactor chamber Surface: 1.008,76 m2 Concrete volume: 968,9 m3 Armature: 93,00 t Metallic parts embedded in concrete: 5,59 t Number of persons in charge with execution: 30 Execution time: 2 weeks Foundation for adhesive tanks Surface: 2.688,00 m2 Concrete volume: 3.763,00 m3 Armature: 99,40 t Metallic parts embedded in concrete: 4,50 [...]
July 25, 2018

GERMANY

EXTERNAL PROJECTS - GERMANY In Germany, we carry out complex projects in the field of energy infrastructure and civil engineering infrastructure, such as: residential ensembles; office buildings; industrial platforms; electrical installations.
July 23, 2018

POLAND

EXTERNAL PROJECTS - POLAND One of the most important construction projects that Electrogrup develops during this period is in Poland, on an area of approximately 70 ha. The project includes land stabilization and improvement works, construction works to build a production plant and construction of roads and paved platforms, with over 260 employees involved in [...]