SANPAUL 110/20KV POWER STATION

August 27, 2018 in ENERGY

SANPAUL 110/20KV POWER STATION

The projected involved the construction of a new power station.

The works included:

  • Building the command-control building with roof
  • Concrete foundations and roads
  • Concrete ducts for 110kV 20kV cables
  • 110kV pillars and support pillars for the equipment, including foundations
  • Steel structure (frame) for supporting the electrical equipment

Civil works: concrete and green yard, access roads, alleys, fences, drainage, concrete path around the building

The electrical works included:

  • 110/20kV power transformer
  • Switches, separators, power and voltage transformers
  • Medium voltage cells
  • Electrical connections (conductors) between equipment
  • Installation of the lightning system (normal and safety), interior and exterior

Telecommunication works included:

  • Installation of telecommunication equipment
  • Installation of telecommunication cables (classic and fiber optic)