The project includes the construction of a power plant consisting of two power plants equipped with gas generator sets, with an individual capacity of 6.72 MW, and the expansion of the 20kV distribution network.
Implemented works:
- Design and authorization
- Construction of the building, command center and exterior functionalities
- Jenbacher engines of 2x3,35 MW
- 30kV connections
- Thermomechanical installations
- Group automation circuits, in collaboration with the equipment supplier
- Internal services for the power plant
- Indoor and low currents installations
- Primary and secondary tests, in collaboration with suppliers and certifiers
- SCADA EMS and DMS implementation
CEG 1+2 are qualified in terms of the new technical regulations on the connection to SEN of the generating sets regarding the system technological services (STS) and can offer range sampling frequency (RSF) and frequency restoration reserves (FRR).
Also, depending on the demand for heat, they can also provide heat in the cogeneration process.