DRUMUL MORARILOR 110KV POWER STATION

August 27, 2018 in ENERGY

DRUMUL MORARILOR 110KV POWER STATION

The works included:

  • Refurbishment of the command-control room (ceiling, lighting, power, heating and air conditioning, partition walls)
  • Repairs to the installations (replacement of pipes, including water leaks, ceramic tile fitting)
  • Concrete foundations and support pillars for the mounting of the modular equipment
  • Repairs to the foundation of the neutral treatment group for medium voltage networks
  • Replacement of the primary 110kV equipment, SF6 modules and of the conductors between the equipment
  • Installation of MV feeders
  • Replacement of the old control and protection panels with new digital equipment
  • Replacement of the AC and DC cabinets
  • Replacement of the battery and electric converter
  • Grounding network for the equipment in the power station
  • Performing working tests and tests for commissioning