BUZAU CRANG 110/20KV POWER STATION

August 27, 2018 in ENERGY

BUZAU CRANG 110/20KV POWER STATION

The works included:

  • Installation of LES 20 kV power lines – 1,5km
  • Reconstruction of the medium voltage grids with jointing and terminlas (34 pcs) for the interconnection with substations
  • Installation of new MV equipment (15 cells) and 20 kV switchgear connections
  • Refurbishment of the control room
  • Construction of concrete foundations
  • Replacement of the control-command panels and secondary circuit cales (command-protection)
  • Replacement of the control-protection cabinets for the 110kV equipment and their integration into the SCADA telecontrol system, including the installation of the telecommunication equipment
  • Replacement of the DC installations for the station (battery and rectifier), including LV internal services (AC and DC)
  • Fire extinguishing system, access and surveillance system

Electrogrup succsessfully completed:

  • Project Management – our teams coordinated the entire work
  • Health & Safety coordonation
  • Primary and secondary 110, 20, 0.4kV equipment installation
  • SCADA sustem

Challanges

  • Working in an operating power station, with underground HV and MV cables and HV equipment
  • Provisionally control circuits and ensuring the consumer`s power supply during the execution of the works