BIHARIA 110/20KV POWER STATION

August 27, 2018 in ENERGY

BIHARIA 110/20KV POWER STATION

The projected involved the construction of a 110/20kV power station

The works included:

  • Building the command-control-building with roof
  • Concrete foundations and roads, concrete and steel structure to support the equipment
  • Replacing and connecting a 110kV pylon (including the foundation)
  • 110kV equipment – 110/20kV power transformer, full line cells (2) and transformer, split cell with separators – MV equipment (16 cells), internal service transformers, AC and DC neutral treatment group
  • Connecting the new power station to the power system (to the 110kV power network and medium voltage networks)
  • Civil works: fences, lightning, courtyard with green space and alleys, access roads, sewerage, concrete alleys around the building

Electrogrup successfully completed:

  • Designing the construction details and drawing up the as-built documentation
  • Project Management – our teams coordinated the entire work
  • Health and Safety coordination
  • Primary and secondary equipment installation
  • SCADA system

Challanges:

  • Constructing a new power station
  • Working in hard winter conditions and time constraints
  • Protecting the environment